i3s Blog

Industrial Change Management: When a Modification Should Trigger a Risk Assessment

A seemingly minor modification to an industrial facility can introduce significant risks to safety and operations. How can we identify which changes require a formal assessment? We analyze the criteria for determining their criticality and the importance of structured, coordinated, and traceable industrial change management.

Scroll to Top